COOPER 1 Two nuclear SCRAMsgreenspun.com : LUSENET : Y2K discussion group : One Thread |
COOPER 1 0% 03/03/01 Refueling
MID-CYCLE MAINTENANCE OUTAGE TO
EXCHANGE A FUEL LEAKER BUNDLE -
AUTOMATIC SCRAM ON LOW REACTOR
WATER LEVEL DURING THE PLANNED
SHUTDOWN FOLLOWED BY A MANUAL
SCRAM IN ANTICIPATION OF LOW
REACTOR WATER LEVEL (Refer to
event #37805)
-- Anonymous, March 05, 2001