Plant Status Report

See Site Location for Plant information.

See Defined Terms for Plant Operational "Modes" and "Conditions."

Ignore "Phone" number, used only by NRC Operations Center Personnel.

NRC OPERATIONS CENTER

PLANT STATUS REPORT FOR 01/24/2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR

COMMENT * #

--- ------------------------ ---- -------- -------------------------------- - -

1 BEAVER VALLEY 1 100 --------------------------------------------------------------------------------

1 BEAVER VALLEY 2 100

--------------------------------------------------------------------------------

1 CALVERT CLIFFS 1 100 --------------------------------------------------------------------------------

1 CALVERT CLIFFS 2 100 --------------------------------------------------------------------------------

1 FITZPATRICK 1 100 --------------------------------------------------------------------------------

1 GINNA 1 100 --------------------------------------------------------------------------------

1 HOPE CREEK 1 100 --------------------------------------------------------------------------------

1 INDIAN POINT 2 99 --------------------------------------------------------------------------------

1 INDIAN POINT 3 100 --------------------------------------------------------------------------------

1 LIMERICK 1 97 Power Operation * COASTDOWN TO REFUELING OUTAGE --------------------------------------------------------------------------------

1 LIMERICK 2 100 --------------------------------------------------------------------------------

1 MILLSTONE 2 100 --------------------------------------------------------------------------------

1 MILLSTONE 3 100 --------------------------------------------------------------------------------

1 NINE MILE POINT 1 95 Power Operation MAINTENANCE IN PROGRESS --------------------------------------------------------------------------------

1 NINE MILE POINT 2 100 --------------------------------------------------------------------------------

1 OYSTER CREEK 1 0 01/21/00 Cold Shutdown MANUAL REACTOR SCRAM . SEE EVENT # 36612.

--------------------------------------------------------------------------------

1 PEACH BOTTOM 2 100 * --------------------------------------------------------------------------------

1 PEACH BOTTOM 3 100 --------------------------------------------------------------------------------

1 PILGRIM 1 100

--------------------------------------------------------------------------------

1 SALEM 1 100 --------------------------------------------------------------------------------

1 SALEM 2 99 * --------------------------------------------------------------------------------

1 SEABROOK 1 100 --------------------------------------------------------------------------------

1 SUSQUEHANNA 1 100 --------------------------------------------------------------------------------

1 SUSQUEHANNA 2 100

--------------------------------------------------------------------------------

1 THREE MILE ISLAND 1 100 --------------------------------------------------------------------------------

1 VERMONT YANKEE 1 100 --------------------------------------------------------------------------------

NRC OPERATIONS CENTER

PLANT STATUS REPORT FOR 01/24/2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR

COMMENT * #

--- ------------------------ ---- -------- -------------------------------- - -

2 BROWNS FERRY 1 0 03/03/85 Refueling DEFUELED --------------------------------------------------------------------------------

2 BROWNS FERRY 2 100 --------------------------------------------------------------------------------

2 BROWNS FERRY 3 100 --------------------------------------------------------------------------------

2 BRUNSWICK 1 100 --------------------------------------------------------------------------------

2 BRUNSWICK 2 100 --------------------------------------------------------------------------------

2 CATAWBA 1 100 --------------------------------------------------------------------------------

2 CATAWBA 2 100 --------------------------------------------------------------------------------

2 CRYSTAL RIVER 3 100 --------------------------------------------------------------------------------

2 FARLEY 1 100 --------------------------------------------------------------------------------

2 FARLEY 2 100 -------------------------------------------------------------------------------

2 HARRIS 1 100 --------------------------------------------------------------------------------

2 HATCH 1 100

--------------------------------------------------------------------------------

2 HATCH 2 98 Power Operation MAXIMUM OPERATING POWER

--------------------------------------------------------------------------------

2 MCGUIRE 1 100 --------------------------------------------------------------------------------

2 MCGUIRE 2 100 --------------------------------------------------------------------------------

2 NORTH ANNA 1 98 Power Operation COASTDOWN TO REFUELING OUTAGE

--------------------------------------------------------------------------------

2 NORTH ANNA 2 100 --------------------------------------------------------------------------------

2 OCONEE 1 100 --------------------------------------------------------------------------------

2 OCONEE 2 100 --------------------------------------------------------------------------------

2 OCONEE 3 100 --------------------------------------------------------------------------------

2 ROBINSON 2 100 --------------------------------------------------------------------------------

2 SEQUOYAH 1 100 --------------------------------------------------------------------------------

2 SEQUOYAH 2 100 --------------------------------------------------------------------------------

2 ST LUCIE 1 100 --------------------------------------------------------------------------------

2 ST LUCIE 2 100 --------------------------------------------------------------------------------

2 SUMMER 1 100 --------------------------------------------------------------------------------

2 SURRY 1 100 --------------------------------------------------------------------------------

2 SURRY 2 100 --------------------------------------------------------------------------------

2 TURKEY POINT 3 100 --------------------------------------------------------------------------------

2 TURKEY POINT 4 100 --------------------------------------------------------------------------------

2 VOGTLE 1 100 --------------------------------------------------------------------------------

2 VOGTLE 2 100 --------------------------------------------------------------------------------

2 WATTS BAR 1 100 --------------------------------------------------------------------------------

NRC OPERATIONS CENTER

PLANT STATUS REPORT FOR 01/24/2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR COMMENT * # --- ------------------------ ---- -------- -------------------------------- - -

3 BRAIDWOOD 1 100

--------------------------------------------------------------------------------

3 BRAIDWOOD 2 100 --------------------------------------------------------------------------------

3 BYRON 1 100 --------------------------------------------------------------------------------

3 BYRON 2 100 --------------------------------------------------------------------------------

3 CLINTON 1 100 * --------------------------------------------------------------------------------

3 COOK 1 0 09/08/97 Refueling REFUELING OUTAGE - DEFUELED --------------------------------------------------------------------------------

3 COOK 2 0 09/09/97 Refueling REFUELING OUTAGE - DEFUELED --------------------------------------------------------------------------------

3 DAVIS BESSE 1 100 --------------------------------------------------------------------------------

3 DRESDEN 2 100 --------------------------------------------------------------------------------

3 DRESDEN 3 100 --------------------------------------------------------------------------------

3 DUANE ARNOLD 1 100 --------------------------------------------------------------------------------

3 FERMI 2 97 --------------------------------------------------------------------------------

3 KEWAUNEE 1 97 --------------------------------------------------------------------------------

3 LASALLE 1 100 --------------------------------------------------------------------------------

3 LASALLE 2 100 --------------------------------------------------------------------------------

3 MONTICELLO 1 0 01/05/00 Refueling REFUELING OUTAGE --------------------------------------------------------------------------------

3 PALISADES 1 91 Power Operation CHEMISTRY HOLD --------------------------------------------------------------------------------

3 PERRY 1 100 --------------------------------------------------------------------------------

3 POINT BEACH 1 48 Power Operation *

INCREASING REACTOR POWER

--------------------------------------------------------------------------------

3 POINT BEACH 2 100 --------------------------------------------------------------------------------

3 PRAIRIE ISLAND 1 100 --------------------------------------------------------------------------------

3 PRAIRIE ISLAND 2 100

--------------------------------------------------------------------------------

3 QUAD CITIES 1 100

* --------------------------------------------------------------------------------

3 QUAD CITIES 2 0 01/21/00 Cold

Shutdown *

ENTERING REFUELING OUTAGE --------------------------------------------------------------------------------

NRC OPERATIONS CENTER

PLANT STATUS REPORT FOR 01/24/2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

REG PLANT NAME %PWR DOWN REASON OR COMMENT * #

--- ------------------------ ---- -------- -------------------------------- - -

4 ARKANSAS NUCLEAR 1 72 Power Operation AT MAX POWER LEVEL FOR 3 OPERATING REACTOR COOLANT PUMPS.

-------------------------------------------------------------------------------- 4 ARKANSAS NUCLEAR 2 100 -------------------------------------------------------------------------------- 4 CALLAWAY 1 100

-------------------------------------------------------------------------------- 4 COMANCHE PEAK 1 100 -------------------------------------------------------------------------------- 4 COMANCHE PEAK 2 100 -------------------------------------------------------------------------------- 4 COOPER 1 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 1 100 -------------------------------------------------------------------------------- 4 DIABLO CANYON 2 100

-------------------------------------------------------------------------------- 4 FT CALHOUN 1 100 -------------------------------------------------------------------------------- 4 GRAND GULF 1 98 Power Operation * INCREASING REACTOR POWER LEVEL

-------------------------------------------------------------------------------- 4 PALO VERDE 1 100 -------------------------------------------------------------------------------- 4 PALO VERDE 2 100 -------------------------------------------------------------------------------- 4 PALO VERDE 3 100

* --------------------------------------------------------------------------------

4 RIVER BEND 1 98 Power Operation * INCREASING REACTOR POWER LEVEL -------------------------------------------------------------------------------- 4 SAN ONOFRE 2 100

-------------------------------------------------------------------------------- 4 SAN ONOFRE 3 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 1 100 -------------------------------------------------------------------------------- 4 SOUTH TEXAS 2 100

-------------------------------------------------------------------------------- 4 WATERFORD 3 100

-------------------------------------------------------------------------------- 4 WNP-2 100

-------------------------------------------------------------------------------- 4 WOLF CREEK 1 100

--------------------------------------------------------------------------------

* - REASON OR COMMENT HAS BEEN CHANGED IN PAST 24 HOURS

# - NUMBER OF REACTOR SCRAMS WITHIN PAST 24 HOURS

NOTE - REACTOR STATUS DATA COLLECTED BETWEEN

4 A.M. AND 8 A.M. EACH DAY.

ALL TIMES ARE BASED ON EASTERN TIMES (ET).