OT, another new gas pipeline needed: SUMMARY: "This Notice advises the public that Mississippi Power Company, has applied for a right-of-way permit for the installation of a twenty (20) inch outer-diameter natural gas pipeline ..."

greenspun.com : LUSENET : TimeBomb 2000 (Y2000) : One Thread

http://frwebgate.access.gpo.gov/cgi-bin/getdoc.cgi?dbname=2000_register&docid=00-847-filed

SUMMARY: This Notice advises the public that Mississippi Power Company, has applied for a right-of-way permit for the installation of a twenty (20) inch outer-diameter natural gas pipeline across 3.02 acres of Grand Bay National Wildlife Refuge in Jackson County, Mississippi, described as follows:

A right-of-way with a beginning width of fifty (50) feet on, over, across, and through that part of the Grand Bay National Wildlife Refuge (NWR) lying and being in Jackson County, Mississippi. The proposed route is paralleling, adjacent, and south of the existing railroad and transmission rights-of-way.

[[Page 2190]]

Commencing at the SW corner of the SE\1/4\ of Section 18, Township 6 South, Range 5 West, thence run North 349.97 feet to the point of beginning; thence S 89 46 58 E, 2632.46 feet to the East line of Section 18. Said right-of-way contains 3.02 acres, more or less.

Also for the purpose and duration of the initial construction and installation of the proposed pipeline, a temporary right-of-way and work space twenty-five (25) feet in width located on the north side of the proposed right-of-way.

The purpose of this notice is to inform the public that the United States Fish and Wildlife Service is currently considering the merits of approving this application.

DATES: Interested persons desiring to comment on this application should do so on or before February 14, 2000.

-- Hokie (Hokie_@hotmail.com), January 14, 2000

Answers

you're right, it is OT.

-- plonk! (realaddress@hotmail.com), January 14, 2000.

Moderation questions? read the FAQ